Customer’s Need
The operating mode of the wood drying kilns involves rapid changes in heat load. Creating additional heat accumulation capacity helps ensure a more stable heat supply and significantly reduces short-term temperature fluctuations caused by overloading the boiler system.
Project Scope and Novel Engineering OÜ’s Role in the Project:
Main contractor for the technology, which included: development of the solution, project design, equipment supply, installation, commissioning, and integration with the existing system.
Project Duration: April – October 2024