Reconstruction of the flue gas cleaning equipment for two 8 MW boilers at the Suur-Jõe heating plant of Gren Eesti AS

Customer’s Need
Due to stricter environmental regulations, it is mandatory to install additional flue gas cleaning equipment on boilers over 5 MW starting from 2025 to ensure that the heating plant meets the new standards.

Project Scope and Novel Engineering OÜ’s Role in the Project:
Main contractor for the entire scope of work, which includes: project design, obtaining permits, removal/dismantling of existing equipment, construction work, supply and installation of new equipment, and commissioning. The equipment supplied includes an ESP filter and multicyclones from the Swiss company IS SaveEnergy AG. The flue gas cleanliness at the output of the new equipment is less than 30 mg/Nm3.

Project Duration: May 2024 – February 2025